Hillside residential terrace
Stepped villas on a graded slope. Foundations set from the aerial terrain model, retaining line coordinated with the anchorage package before the layout was frozen.
Project record
Construction, geotechnical, aerial survey and environmental compliance work, filterable by discipline. Every plate below is a placeholder awaiting approved site photography or an ortho-mosaic export.
Stepped villas on a graded slope. Foundations set from the aerial terrain model, retaining line coordinated with the anchorage package before the layout was frozen.
Two rows of pre-stressed ground tiebacks holding a secant wall through a [XX] m excavation, every production anchor proof-tested to 1.33 × design load.
Pre- and post-excavation captures reconciled the contractor's claimed earthwork against a measured surface, with the difference reported to ±2 %.
Soil nails installed top-down in staged lifts with shotcrete facing and drainage composite, following a failure during the [YEAR] monsoon.
Mixed retail and office block delivered in phases so the trading floor stayed open, with monthly aerial captures tied to each billing certificate.
Consent to Establish filed before construction and Consent to Operate after commissioning, with the effluent routing settled on the drawings rather than after the first inspection.
Authorisation under the H&OWM Rules with a redesigned storage yard, manifest handling and disposal through an authorised TSDF, followed by the annual return.
Full site captured at 1.5 cm/px with surveyed ground control, delivered as DXF contours at 0.5 m interval and a classified point cloud for the design team.
Project names, locations and figures are placeholders. Replace them with the approved reference list before launch — and keep a client consent note against each one.
Tell us the type and location and we will put you in touch with a client who has built one.